Commissioning
Data Center & Mission-Critical Facility Commissioning
You just spent hundreds of thousands of Euros on building a server room or millions of Euros building a Tier III or IV data center. Now, you are ready to begin operations… or are you? Do you know if your facility was built and is performing to specifications? Are you sure your mission-critical infrastructure was completely tested as an integrated system? Did you just perform "Start-up" or did you conduct a fully documented, comprehensive integrated systems test, simulating multiple run and failure modes?
A deficiency in one component can compromise the operation and performance of the whole. Neosoft Company' Commissioning Services ensure that each component of the mission-critical infrastructure performs precisely as prescribed, individually and as an integrated system. We make certain that your data center and mission-critical facility's build-out matches the design intent.
Right, from the Start
Neosoft Company' Data Center & Mission-Critical Facility Commissioning process extends through all phases of a new or renovated facility's lifecycle – from conceptualization to occupancy, training and operation. Throughout each stage of the process, validation is performed to assure that your design requirements are met or exceeded.
Neosoft Company'' Data Center Commissioning is a systematic process that:
- Records the Facility's Design Intent
- Documents the Design Team's Basis of Design
- Develops Commissioning Specifications
- Validates the Functional Performance of Each Individual Electrical and Mechanical Component
- Validates the Overall Functional Performance of the System as a Whole
Mission-Ready
Find out how Neosoft Company' Data Center & Mission-Critical Commissioning ensures the absolute maximum uptime for your mission-critical facilities.